Download the TFW Engineering Study

Downloading this case study is your opportunity to learn how K-TIG was implemented to improve the efficiency of stainless steel spooling at TFW Engineering.

The case study outlines:

  • How TFW Engineering reduced costs by 93% whilst improving quality. 

  • TFW Engineering's previous set-up compared with their current K-TIG set-up.

  • Why the Director confirms that K-TIG  "delivers as promised".

 

TFW - cleaned up
 
 
 
 
 

Download the Case Study Now