Download the General Electric Case Study

Downloading this case study is your opportunity to learn how K-TIG was implemented to weld stainless steels and exotics at General Electric.

The case study outlines:

  • How General Electric reduced costs by 93% whilst improving quality. 

  • General Electric's previous set-up compared with their current K-TIG set-up.

  • Why the Principal Joining Engineer described the overall savings as "extraordinary".

 

 
 
 
 
 

Download the Case Study Now